DEVELOPMENT HISTORY
With the nearly 20 years development journey, ADC PLASTIC currently owns a factory with modern technology leading in Vietnam, with a total area 15,000 m2 and a total capacity about 460,000 tons/year.
![](https://adcplastic.com/wp-content/uploads/2023/11/z4847545498233_b6ac33af536d34ffa6ffd0242895aea8-1024x683.jpg)
![](https://adcplastic.com/wp-content/uploads/2023/11/z4847545497988_84e9e9f6f33e2665af3bccb8350c7701-1024x683.jpg)
![](https://adcplastic.com/wp-content/uploads/2023/11/z4847545498052_93b2f8839bda1c22858cfd3f5487c0de-1024x683.jpg)
![](https://adcplastic.com/wp-content/uploads/2023/11/z4847545498232_6d0984fcee31d37e1c58b772d051f0b9-1024x683.jpg)
2023
ADC PLASTIC Factory – Yen My, Hung Yen has come into operation with 100% modern technology, reaching a total capacity about 460,000 tons/year and a total area of 15,000 m2.
2021
Completed the basic construction of ADC PLASTIC factory in Yen My 2 Industrial Park – Hung Yen.
Installed 5 new production lines with a total capacity about 55,000 tons/year
2020
Started the new project of building a factory in Yen My 2 Industrial Park – Hung Yen.
2019
Installed all new technology lines with a total capacity about 120,000 tons/year
2013
9 production lines for producing Filler & Color Masterbatch with a total capacity of 54,000 tons/year
2010
6 production lines for producing Filler Masterbatch with a capacity about 30.000 tons/year
2007
4 production lines for producing Filler Masterbatch with a capacity about 19.000 tons/year
2004
2 production lines for producing Filler Masterbatch with a capacity about 9.600 tons/year